The project is based on an understanding of the flexibility of the workspace and adaptability to the changing requirements of buyers and tenants. The entire engineering of the project is well-thought-out in terms of multifunctionality of tasks, effective space planning, and ergonomics.
Automated control of power supply, lighting, ventilation, and air conditioning systems. Particular attention was paid to security during the project development: an access control system is provided, as well as a video surveillance system at all the entrances to the premises, the adjacent territory, parking, and the lobby. There is a parking access system with license plate recognition.
-Useful roof with a garden and a sitting area – Roof Garden.
-Maintenance floor, server rooms, and an archive.
-Gym and SPA.
-Dining room and coffee shop for employees.
-Parking spaces for electric vehicles with a charger.
TECHNICAL SPECIFICATION:
-Earthquake-resistant frame.
-Natural stone floor in common areas.
-Ceramic tiles floors and walls in WC.
-High standard sanitary ware from famous brands.
-Outdoor raised floor with ceramic top.
-High standard kitchen cabinets and internal doors.
-Provision for 3-pipes VRF air conditioning system combined with ventilation system with air-to-air heat exchanger (recuperator).
-Uninterruptible power supply.
-Raised floor.
-Suspended gypsum board ceilings with integrated lighting, sensors, audio speakers, and ventilation grilles.
-Fiber optic internet.
-High-speed elevators with a waiting time of maximum 30 seconds.
-Photovoltaic solar panels.
-Panoramic glazing with sun protection.
-Energy-saving window frames.
-Basic finish – shell &core.
Thermal insulation, waterproofing.
Compare listings
Compare